Read the board, steps, budget and timing
The board runs left to right from the goal to the idea, the directions and their steps, and every figure on a step card carries a badge saying where the number came from.
The board is one canvas, not a wizard. Everything stays on screen: what we found out about you, what we asked, and the plan itself, wired left to right in the order it happened.
The shape of it
Goal
├─ The idea
└─ Direction
└─ Step
├─ Who this step contacts
├─ What gets posted
└─ What it costs, and when
- Goal, where the plan starts.
- The idea, the creative concept the plan is built around.
- Direction, a line of attack. A direction that has not been opened yet carries a Break this into steps button. Expanding one counts against your daily plan builds.
- Step, the unit you can actually act on. It decides a platform, a format, how many influencers and what it costs.
- Under a step sit its detail cards.
Zoom with plus and minus, press zero to fit the whole plan on screen, and use Collapse all or Expand all to work one layer at a time. On a phone the same plan is drawn as an ordered list instead of a canvas.
Reading a step card
A step card carries how many influencers it contacts, where they post, what it costs and where every number came from. Common figures:
| Figure | What it is |
|---|---|
| Influencers contacted | How many the step reaches out to |
| Influencers who accept | The forecast of how many take it |
| People reached | The forecast audience |
| Cost | What the step costs |
| Units to ship | The boxes you pack, when the step ships product |
| Product value | What those units are worth |
| Typical influencer rate | The going rate behind the cost figure |
| Pay per result | Only spent when the result happens, and not part of the cost above |
Each step also says whether we run it or you run it, and when it starts (at the start, or on a given day of the plan).
Where the numbers come from
Every figure sits beside a badge, and Where these numbers come from opens the reason behind it. It is a button and not a hover, so it works on a phone.
| Badge | Meaning |
|---|---|
| Keepface data | A price or a number taken from agreements actually made on Keepface |
| Benchmark | An industry figure, not one of ours |
| Your answer | Something you told us |
| Assumption | Our own planning default, stated as one |
| Unknown | Not enough behind it to state a figure, so none is stated |
Where figures are added together, the total takes the weakest badge it is made of.
Who this step contacts
This card says what the selection is: how many influencers, what size, which market, which category, which of our lists they were selected from, and how large the pool is. It shows a few of them without handles and links nowhere. A missing attribute is a dash, never a zero, because a follower count of nought is an account we have not synced rather than a person with no audience.
Outreach still fans out to everyone in the pool when you run the campaign, see why public lists show 6 samples.
What gets posted
Platform, format, what gets posted, what it says, anything it also says, the hashtag, and what the campaign does not claim. It also names what the brief will pin down and the disclosure your market requires by law, which is written into the brief when you start the step.
What it costs, and when
The budget card adds up the steps on the board. Two things to know:
- Nothing is charged until you start a step. The total is what the plan proposes, not a bill.
- Held in reserve is the share of a budget the plan deliberately does not spend. It is settled against a budget you set, so until you set one it shows as a dash. See Correct the plan for fitting the plan to a budget.
Phases and timing
The plan runs for 90 days, cut into phases. Exactly one goal is being optimised for at any point, and the phases never overlap. Each phase carries its order, its length in days, its goal and the steps under it. A step whose mechanism our ladder does not place is listed as not placed in a phase, with the reason, rather than dropped into a phase we picked for it.
Phases carry no dates. That is deliberate, see the FAQ above.
Related
Frequently asked questions
What do the badges under each number mean?
They say what the figure rests on. A price taken from agreements actually made on Keepface, an industry benchmark that is not ours, something you told us, our own planning default stated as one, or not enough behind it to state a figure at all.
Why does a step show a dash instead of a number?
Because nothing behind it could produce one. A missing figure is always shown as a dash rather than filled with a plausible number.
Why do the phases have day numbers instead of dates?
The calendar is a later part of the product. Until it exists a phase carries an order and a length in days, and the plan says the dates are not set rather than inventing them.
What is the reserve?
The share of the budget the plan deliberately does not propose spending. It is worked out against the budget you set, so on a board with no budget set it shows as a dash.
Why is one of my steps greyed out?
It does not fit the budget you accepted, so it is out of the plan and cannot be started. It keeps its figures and comes back on its own if the budget goes back up.